Problems Solved
Mining Drainage
Drainage drilling for open-pit operations and tunnel applications — backed by decades of mining drainage experience.
THE PROBLEM
Open-pit operations and tunnel projects depend on keeping water out of the working face. The drainage scope is rarely simple — angles, depths, and access constraints push it well past what standard drilling rigs can handle, and the operating schedule rarely allows for trial-and-error.
JDC'S APPROACH
JDC's horizontal drain program installs drains up to 1,500 feet in depth, at angles from 30 degrees below to 60 degrees above horizontal — depths and angles that open up drainage solutions standard rigs can't reach. The same toolkit handles horizontal-to-vertical drain transitions in tunnel applications, where the work has to follow the bore.
Our equipment — much of it designed and manufactured in-house — and our decades of drainage-drilling experience are what we bring to a mine drainage project.
If you're evaluating drainage drilling scope for an open-pit operation or a tunnel project, we're available for consulting on slope stabilization and can provide feasibility and price estimates.
JDC'S TOOLKIT
- —Horizontal drains up to 1,500 feet in depth
- —Drain angles from 30° below to 60° above horizontal
- —Horizontal-to-vertical drain transitions for tunnel applications
- —Large-diameter reverse-circulation flooded wells
- —JDC-manufactured equipment matched to the geology
Get in Touch
Mining Drainage
Scope to Discuss?
JDC has been drilling drains in open-pit and tunnel applications since 1966. Let's talk.
Call 24/7 — 541-541-3670 →