Problems Solved

Mining Drainage

Drainage drilling for open-pit operations and tunnel applications — backed by decades of mining drainage experience.

THE PROBLEM

Open-pit operations and tunnel projects depend on keeping water out of the working face. The drainage scope is rarely simple — angles, depths, and access constraints push it well past what standard drilling rigs can handle, and the operating schedule rarely allows for trial-and-error.

JDC'S APPROACH

JDC's horizontal drain program installs drains up to 1,500 feet in depth, at angles from 30 degrees below to 60 degrees above horizontal — depths and angles that open up drainage solutions standard rigs can't reach. The same toolkit handles horizontal-to-vertical drain transitions in tunnel applications, where the work has to follow the bore.

Our equipment — much of it designed and manufactured in-house — and our decades of drainage-drilling experience are what we bring to a mine drainage project.

If you're evaluating drainage drilling scope for an open-pit operation or a tunnel project, we're available for consulting on slope stabilization and can provide feasibility and price estimates.

JDC'S TOOLKIT

  • Horizontal drains up to 1,500 feet in depth
  • Drain angles from 30° below to 60° above horizontal
  • Horizontal-to-vertical drain transitions for tunnel applications
  • Large-diameter reverse-circulation flooded wells
  • JDC-manufactured equipment matched to the geology

Get in Touch

Mining Drainage
Scope to Discuss?

JDC has been drilling drains in open-pit and tunnel applications since 1966. Let's talk.

Call 24/7 — 541-541-3670

How Can We Help?

No obligation. One of our engineers will be in touch within 24 hours.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.