Solutions
Dewatering
Complete dewatering system design and installation — from barge to crane access, deep well to wellpoint, backed by licensed hydrologists.
COMPLETE DEWATERING SOLUTIONS
Jensen Drilling Company designs and installs complete dewatering systems for construction dewatering, landslide stabilization, and environmental projects. We utilize deep well eductors and wellpoint systems, installing deep well dewatering systems with well diameters from 8 inches to 36 inches.
For fine-grained formations requiring more than 20 feet of pumping capacity, JDC installs eductor wells with pressure and return headers — a proven approach for difficult conditions where standard methods fall short.
JDC utilizes licensed hydrologists to design complete dewatering systems. From project scoping through system operation training, we cover the full scope. Location and access are never a problem — JDC has accomplished dewatering from barge access to crane access in some of the most challenging environments imaginable.
SPECIFICATIONS
- —Well Diameters: 8" to 36"
- —System Types: Deep well eductors and wellpoint systems
- —Fine-Grained Formations: Eductor wells with pressure and return headers when more than 20 feet of pumping capacity is needed
- —Hydrology: Licensed hydrologists design complete dewatering systems
- —Access: Barge access to crane access — location never a problem
WHY ENGINEERS SPECIFY JDC
LICENSED HYDROLOGISTS.
PROVEN RESULTS.
- —Licensed Hydrologists. Licensed hydrologists design every system to match the site's subsurface conditions — not a one-size-fits-all approach.
- —Full Scope, Start to Finish. From project scoping through installation to system operations training — as JDC did for the Fresno Dam and Reservoir dewatering network in Montana.
- —Access Is Never a Problem. JDC has accomplished dewatering from barge access to crane access in some of the most challenging environments imaginable.
CASE STUDY
Fresno Dam and Reservoir
106 Primary Deep Wells — Milk River Project Dam Safety Modification.
Deep well dewatering network furnished, installed, and operated across multiple construction seasons for a Bureau of Reclamation dam safety modification — controlling groundwater in variable glacial soils so the general contractor could safely excavate the embankment and construct a new filter and drain system.
View Full Project →Get in Touch
Water Management Starts
with the Right Team.
Licensed hydrologists, access to anywhere, proven results. Talk to JDC about your project.
Call 24/7 — 541-541-3670 →