Problems Solved
Infrastructure Protection
Drilling work that keeps long-life infrastructure in service — across DOT corridors, water systems, and the assets that depend on stable ground.
THE PROBLEM
Highways, water infrastructure, and corridor assets share a common vulnerability — they sit on or near ground that doesn't always behave. Slope movement, settlement, water pressure, and erosion all threaten the asset, and the cost of letting any of those go is higher than the cost of fixing them at the right time.
JDC'S APPROACH
JDC's drilling work in this space spans the obvious infrastructure protection categories. For DOTs: tieback anchor systems and grade beam retention walls (as on Interstate 94 in North Dakota), plus multi-year horizontal drain programs along corridors where slide mitigation is the difference between a corridor that stays open and one that doesn't (as on Highway 20 in Oregon).
For water infrastructure: lake-bottom anchor installation that won AGC Project of the Year recognition in 2010, holding a submerged sewer line in place across two miles of lake bottom. For dam safety work: deep well dewatering networks like the 106-well system furnished and operated across multiple construction seasons for a U.S. Bureau of Reclamation dam safety modification on the Milk River Project in Montana.
Beyond those examples, our drilling and grouting capability covers everything from highway foundation work to dam projects — with unique equipment designed and manufactured by JDC for jobs that need to be done quickly and economically.
JDC'S TOOLKIT
- —Tieback anchors and grade-beam retention systems for highway and corridor work
- —Horizontal drain programs to stabilize slopes carrying active infrastructure
- —Lake-bottom anchor installation for submerged water infrastructure
- —Dewatering for shaft, tunnel, and excavation work
- —Drilling and grouting from highway foundation work to dam projects
INFRASTRUCTURE PROJECTS
- Anchoring a Floating Sewer400+ lake-bottom anchors installed in a sinusoidal pattern across two miles to submerge a sewer line. AGC Project of the Year, 2010.
- North Dakota DOT Tie Back AnchorsPilot tieback installation on Interstate 94 to mitigate an active landslide and reduce costly yearly paving repairs.
Get in Touch
Infrastructure With a
Geotechnical Drilling Scope?
JDC drills the work that keeps long-life assets in service. Let's talk.
Call 24/7 — 541-541-3670 →