Horizontal Drains

Horizontal Drain Drilling — US 20 PME

587,000+ Feet of Drains Over 10 Years — Highway 20 Corridor

Location
Eddyville, Oregon (Highway 20)
Total Drains Installed
587,000+ linear feet (approx. 111 miles)
Project Duration
10 years of active construction
Corridor Length
5.5-mile stretch of US Highway 20
Landslides Addressed
Multiple active landslides
Peak Flow Recorded
Several million gallons per 48-hour rain event
Operations
Multiple drill units, 24/7 work shifts
Service
Horizontal Drains

Project Overview

The US 20 PME (Perpetual Motion Event) project represents one of the most extensive horizontal drain installations in JDC history. Over the course of ten years of active construction, JDC installed more than 587,000 feet — approximately 111 miles — of horizontal drains along a new 5.5-mile stretch of Highway 20 near Eddyville, Oregon.

The corridor passed through terrain with multiple active landslides. JDC used aggressive horizontal drain placement to systematically address each failure zone, removing the groundwater pressure that was driving slope movement and allowing construction of the new highway alignment to proceed safely.

JDC also constructed conveyance systems to direct captured water flow into existing stream tributaries. Weir monitoring recorded over several million gallons of water in 48-hour periods during major rain events — confirming the drains were performing as designed even under extreme conditions.

To meet the project timeline, JDC deployed multiple drill units and operated work shifts around the clock — a logistical commitment that kept the project on schedule despite the enormous scope and challenging geology.

Get in Touch

Large-Scale Horizontal
Drain Project?

JDC has installed 111 miles of drains on a single project. Scale is no obstacle.