Industries

Pipeline & Water Infrastructure

JDC's pipeline-adjacent track record runs from lake-bottom anchoring of submerged sewer lines to broader drilling capabilities that translate to right-of-way work.

SUBMERGED ANCHORING, PLUS A BROADER TOOLKIT

JDC's headline pipeline-adjacent project is the AGC-recognized lake-bottom anchoring of a submerged sewer line in Lake Oswego, Oregon — over 400 anchors installed across two miles, in 50 feet of water, with 6-inch placement tolerance using two Longyear BD 102 drills mounted on a purpose-built barge.

Beyond that specific job, the broader JDC drilling toolkit applies to pipeline-adjacent geotechnical scopes more generally: horizontal drains where corridors cross landslide-prone ground, drilling and grouting for ground improvement, and dewatering systems for excavations and tie-ins. If your pipeline project has a geotechnical drilling component, we'd like to talk through what we can bring to it.

PIPELINE-ADJACENT TOOLKIT

  • Barge-mounted drilling for submerged anchor installation
  • Anchors installed in lake beds with 6-inch placement tolerance
  • Horizontal drains for landslide-prone corridors
  • Drilling and grouting for ground improvement and right-of-way work
  • Dewatering for excavations — deep well and wellpoint systems

Headline Project

Get in Touch

Pipeline Project With a
Drilling Scope?

JDC's capabilities reach from the lake bottom to the slope. Let's talk.

Call 24/7 — 541-541-3670

How Can We Help?

No obligation. One of our engineers will be in touch within 24 hours.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.